DNV GL

Energy Management and Efficiency

on the Norwegian Continental Shelf

Nor
 
Eng
  • Home
  • Energy management
    • Plan
      • Getting started
      • Energy review
      • Baseline
      • KPIs
      • Objectives
    • Do
      • Competence, training and awareness
      • Internal and external communication
      • Reporting
      • Operational control
      • Field Development
      • Procurement
      • Project support
      • Energy and climate accounting
      • Opportunity
    • Check and act
      • Monitoring and measuring
      • Corrective and improvement actions
      • Internal audits
      • Management review and improvement
    • Tools
      • Measures
      • ISO 50001
      • Integration with other management systems
      • Documentation
      • Further readings
  • Measures
  • KPIs
  • Energy and climate accounting
  • Project support
    <
  1. Back to the results
Opportunity 58: Upgrade of combined cycle system

Upgrading of waste heat recovery system on Eldfisk 2/7 E, used for power generation. Previously this system only covered exhaust heat from two water injection turbines and one gas compression turbine.

Unstable operation of the old system led to use of a back-up generator to have sufficient power. It was therefore decided to upgrade the system with a new heat recovery solution. The new system consists of two independent parts that can cover exhaust heat from four water injection turbines (only two at a time), and one gas compression turbine on Eldfisk 2/7 E.

This new system is anticipated to provide 9.5 MW of power output, 2 MW more than the old system. The improvement opportunity was implemented to enhance the overall efficiency of the power generation system, as well as cover the additional power demand at Eldfisk from execution of the Eldfisk II project.

Parts of the increased power demand will now be met by the enhanced efficiency of the combined cycle system, instead of additional fuel gas consumption.

Results:
Reduced CO2 emission with about 12 000 tons per year
Reduced fuel gas consumption

ConocoPhillips has implemented this measure on Eldfisk 2/7 E

System group: Electrical (80-89)
Type: Modification Investment: Not quantified
Profitability: Not quantified Implementation: Implemented

Support

Contact us

About the project

DNV GL Group

The Norwegian Oil and Gas Association

Energy management and
efficiency

Contact person: Trym Edvardsson

Email: energiledelse@dnvgl.com

Email: te@norog.no

Read more about the project