Opportunity 3: Reduced flaring | |
---|---|
Procedures for flaring on Alvheim were optimised in order to reduce the amount of gas flared on a yearly basis. The new procedure sets time limits for how long gas can be flared during process instabilities, shut-downs and start-ups. Flaring is allowed for limited time provided that normal operation is imminent. In most cases this time period is set to 4 hours. This opportunity does not require investment nor additional operational costs. Results:
|
|
System group: Process support and utility systems (40-69) | |
Type: Operations optimisation | Investment: < 0,1 MNOK |
Profitability: Profitable | Implementation: Implemented |