| Opportunity 12: Pump optimisation | |
|---|---|
|
Operational optimisation of pumps should be evaluated since those are among the largest energy users on oil and gas installations. This can be achieved through, e.g.:
|
|
| System group: System general | |
| Type: Operations optimisation | Investment: 1 - 10 MNOK |
| Profitability: Variable | Implementation: Assessed/Implemented |